DELIVERY LEAD TIMES:

AVERAGE IS 4 WEEKS, NOT 4 MONTHS.

Building Delivery
Building Erection

BUILDING ERECTION:

QUICKER INSTALLATION WITHOUT CRANES, TORCHES, OR WELDING REQUIRED WHICH EQUALS LESS MANHOURS.​

FOUNDATION DESIGN:

20%-25% COST SAVINGS!

FOUNDATION DESIGN CAN BE PROVIDED WITH DRAWINGS.​

ANCHOR BOLTS ARE ALSO INCLUDED WITH THE BUILDING DELIVERY AND DRILLED DURING COLUMN INSTALLATION.

Anchor Bolts Install
Cold Formed Building

INSURANCE BENEFITS:

COLD-FORMED METAL IS RESISTANT TO PESTS, FIRE, AND DECAY. IT IS ALSO RECYCLABLE, REDUCING ITS CARBON FOOTPRINT.​

EXPRESS ENGINEERING:

DEPENDING ON DESIGN COMPLEXITY, PERMIT DRAWINGS STAMPED BY A PROFESSIONAL ENGINEER CAN BE PROVIDED THE SAME DAY AS THE BUILDING ORDER IN THESE 31 STATES.​